Since its formation in 2008, Quanta Renewable Energy Services (QRES) has established itself as of the EPC leader for engineering, procurement and construction (EPC) of large commercial and utility-scale photovoltaic (PV) facilities. QRES has more than 100 MW of projects completed or currently under construction. QRES offers a full menu of services to our customers including:
- EPC services for large commercial and utility-scale solar photovoltaic projects
- Fixed ground-mount
- Ground-mount tracker
- Fixed roof-mount
- Engineering services – production modelling, technology selection and system optimization support
- Supply chain management
- Project development services
- Substation design and installation
- Transmission and grid interconnection
- Operation and maintenance services
- Financial services
Representative projects include:
Eurus Energy Holdings and NRG Solar: Three adjacent projects (Avenal Park, Sun City and Sand Drag) totaling 45MWac – 450,900 modules and 45 inverters
- Optimized project design and implementation process within given parameters
- Performed site preparation and underground distribution system
- Installed photovoltaic array structure and performed grid interconnection
- Procured electrical equipment
- Designed and installed 34.5kV distribution system and 34.5/70kV substation
- Expected completion by summer 2011
Meridian (Cleantech): 5 MWac – 50,040 modules and 5 inverters
- Upon completion in 2009, the CalRENEW-1 project was the fourth largest solar photovoltaic project in California.
- Optimized project design and implementation process within given parameters
- Performed site preparation and underground distribution system
- Installed photovoltaic array structure and performed grid interconnection
- Procured electrical equipmentDesigned and installed 70 kV Substation
- Completed in four months, August 2009 – November 2009
Sempra Energy: 10 MWac – 167,400 modules and 10 inverters
- Solar PV plant is located on more than 88 acres and will produce 17.5 million kWh annually
- Performed site preparation and underground distribution system
- Installed and interconnected array structure and grid connection
- Completed in six months, June 2008 – December 2008
Request a proposal or more information.