Big Stone South to Ellendale, 345-Kv Power Transmission Line

Milbank, S.D., to Ellendale, N.D.
Award of Merit

Owner: Otter Tail Power
Partners: Montana Dakota Utilities
Lead Design Firm: Power Engineers
Prime Contractor: Brink Constructors Inc.
Environmental Engineer: HDR
Construction Management: Beste Consulting
Civil Construction General Contractor: Tri-State Drilling
Subcontractors: A&I Services; Dahn Construction; Fiber Network Solutions; KLJ; Power Consulting Associates; Webster Scale; Winco Powerline Services

This project installed a 163-mile-long, 345-kV extra high-voltage power transmission line from South Dakota to North Dakota. Designed to withstand harsh elements, the power line features monopole tubular steel on concrete drilled-pier foundations with a bundle twisted-pair 477-T2 ACSR conductor. The footprint was minimized on landowners’ fields, while the route avoided buildings and excessive tree removal and minimized obstruction of crop land.

Read More at ENR

Recommended Posts

Back to index
In the News
EnVision Podcast

June 6, 2020 Join Federal Energy Regulatory Commission Chairman Neil Chatterjee for the EnVision Podcast as he sits down with thought leaders...

Learn More
In the News
EEI Announces Finalists for 2020 Edison Award

May 29, 2020 The Edison Electric Institute (EEI) today announced the finalists for the 2020 Edison Award.

Learn More
In the News
Contracts Awarded for Maine Transmission Line Project

April 8, 2020 The New England Clean Energy Connect (NECEC) has awarded more than $300 million in contracts to build and upgrade transmission and...

Learn More
Back to Top