Completion Date: September 2019
Location: West Virginia
Client: EQT
The project begins near the community of Leivasy, WV and ends near the community of Dawson, WV.
The pipeline travels through Nicholas, Greenbrier, and Fayette countries.
The project includes installation of four mainline valves.
The project has one major river crossing and mountainous terrain at elevations that exceed 3000 feet.
The project connects at the southern end to MVP’s Stallworth Station.
Repair a corroded subsea Arctic oil flowline running 18,459 ft from an offshore man-made island to shore facilities on the Arctic coast.
View ProjectSpread 5 - 20 Miles of 36”, Spread 6 - 30 Miles of 36”
View ProjectQPSE provided engineering, procurement, environmental permitting and construction services for three pipelines: a 34-mile, 6-inch olefins pipeline; a 36-mile, 12-inch vacuum gas oil (VGO) pipeline;...
View ProjectOur culture is about supporting an environment where all employees can be themselves, are valued and have an equal opportunity to succeed. At Quanta it’s not a job – it’s a career.
Learn MoreThe energy industry makes modern life possible, but few realize how intertwined the electric power, pipeline, industrial and communications industries are in our daily lives. Quanta Services builds the infrastructure that powers your world.
Learn More